Application Of EPS In Rio's Olympic Stadium

Update: 2016-08-16 11:40      View:
31 th Summer Olympic Games in Beijing on August 6, held in Rio de Janeiro. Ever since the opening of the Rio Olympic Games, many people focus on swimming new male God - Ning,ZetaoNing,Zetao has handsome appearance, perfect body, humble personality, dressing was thin, strip meat, with strong strength and temperament idol, he became the new god swimming, flying fish Asia.



Former national swimming team head coach Chen Yunpeng said: Ning,ZeTao has a good development trend, the appropriate age, height is 1 meter 91, belong to the world short-distance freestyle average body,with good muscle line, dash strength good, strong psychological quality, have the world's best sprinter.We can look forward to his breakthrough in the field of flying fish in the world.
 
 
The Rio DE janeiro Olympic Games, in addition to such as NingZeTao,
Sun Yang,Zhang Jike,LEO,Kato RyoheiThomas Robert Daley,Marcel Nguyen something fresh meat is more eye-catching, Olympic venues construction is also very impressive.



The Rio conference and exhibition center with a total of four venues, only 5 minutes away from the Olympic village and the paralympic village.The Rio conference and exhibition center is the landmark of the city, also is the site of large-scale activities.




The four venues of ICF wall body and ground are introduced energy-saving insulation wall insulation concrete (plate) insulation system.Namely, at the bottom of the interior concrete floor laid a layer of foam material thermal insulation material.
 
As is known to all, compared to concrete and brick building, not only stronger, but also has higher waterproof function, the hall walls, doors, Windows are in ICF overall pouring out, so the rain will not through the gap into the Olympic stadium.



The Portland cement association commissioned a study concluded that: the use of ICF in exterior walls of residential and compared to similar brick house, on the heating and cooling can energy saving 32% 71%, implement the concept of energy conservation and environmental protection green Olympics.
 
At the same time,in addition to very strong in terms of fire prevention,ICF wall is also prominent, the firewall test, the ICF module refractory time is longer than ordinary frame wall.So in building energy saving rapid development today, the EPS board exterior insulation system is the Olympic organizing committee system of the only choice.
 
But the architect that will influence the realization of the elevation effects, and EPS cornice completely reassure the Olympic stadium architects, not only that, more can make the architect design modelling follow one's inclinationsly, cooperate with external thermal insulation wall is perfect.



EPS decorative cornice is a new type of external wall decoration line and components, it can completely replace the traditional concrete (GRC) component, more suitable for installation on EPS, XPS exterior wall thermal insulation wall.Can not only reflect the adornment style of European classical, elegant, and can guarantee the main hall building external wall is not a cold, the heat bridge effect.
 
Especially for the Olympic stadium this more complex Europe type style of the high-rise building, cement component installation is very difficult, long construction period, the time will be cracks, poor durability, and use EPS decorative cornice, has the advantage of easy installation, economy and durability, long.



EPS decorative cornice is stripping by B2 fireproof poly ethylene as the main body, stupid paste alkali-resistant glass fiber grid cloth, outside the special adhesive protection compound and into.Is not affected by changes in temperature, cold and heat;Don't be affected with damp be affected with damp moisture and the influence of acid rain.EPS decorative cornice thread (piece) of smooth, beautiful, no gaps between the linear.Because of using the gap between the two lines repair material, makes the gap disappeared altogether, Olympic venues in the later use also won't appear crack.
 
It can be said that the EPS decorative cornice can fire prevention is not a toxic substances, high-quality decorative building materials is environmental protection product.EPS cornice adopt computer numerical control cutting, quick production, variety types, such as lines, Roman column, the window is covered, stone, etc., can be installed on the edges of the window, door, eaves Angle and wall body;Make the Olympic venues facade of the building more beautiful, more buildings bring brand-new, unique creative designers.



Further, since the EPS decorative cornice computer design style automatic cutting lines (member) style inclinations, processing is relatively simple, easy to install.
 
In 50 × 50cm decorative cornice, for example, its weight is about 1/6 of GRC decorative lines. A person can move freely. The use of special bonding material and methods, one person can install construction, especially in the larger body mass member, just adhesive installation. Construction just insert building blocks, put a reinforced concrete filling mortar. Molding, eliminating the need to support the cost of the traditional template template, templates demolition process and the use of templates, improve labor efficiency, reduce labor costs, speed up the construction speed. So Rio Olympic Hall could be completed quickly in a short time later.



In addition to the Olympic stadium in many applications,all aspects of our daily lives and it also has a close association with EPS.Next time I'll introduce the application of eps in geo foam.Wish States Olympic athletes can achieve good results.See you next week.